Bathroom Remodel – Hicksville, Ohio

NOBODY likes to have a contractor drag out a remodeling project for 10-12 weeks.  I pride myself in being highly expeditious and minimally invasive with my bathroom remodel projects; I can usually be in and out in JUST 3-5 DAYS.  In most cases, you can be right back to your regular schedule by week’s end.  In this particular job, we completed two complete bathroom remodels in just 10 days, including some rough plumbing and wall modifications.  We installed a 48″ walk-in shower with seat and sliding bypass doors, a raised-height toilet, a solid marble vanity top with Delta Porter faucet, a medicine cabinet, a couple hanging pendant light fixtures, and nice Congoleum Cottage Plank vinyl flooring.  In addition, we installed 12″ shelving in some leftover space adjacent to the shower.  This 1970s bathroom prevails no more!  Welcome to 2018!  If you’d like a free estimate for YOUR dream bathroom, hit me up at 419-212-3200.

 